LOCATION
Sunnyvale, CA
client/general contractor
Leopardo Construction
square footage
— square feet
estimated time of completion
completed mm/yr
Project Overview
Project completed with high-end finishes and complex ceiling systems, showcasing MTD Drywall’s
ability to self-perform and deliver in demanding healthcare environments.
Scope of Work
- Metal framing
- Drywall installation & finishing
- ACT ceilings
- In-wall backing
- Head-of-wall blocking
- RTU curbs, levers & underpinning
- Specialty suspended ceilings
- In-wall insulation
Key Materials / Systems
- QuietRock ES 530
- Supreme Metal Stud Framing
- Johns Manville R-13 Sound Batt
- MDC Baffle Ceiling
- Zintra Light Mobels
- Armstrong Lyra Concealed
- Armstrong 360 Black w/ custom 6” radius Axiom
- Armstrong Fine Fissured Tiles
Project Highlights
- Fast-track schedule with overlapping trades
- Limited access above existing ceiling requiring field verification
- Extensive MEP coordination
- Field-driven RFIs resolving design gaps
- Repeat client with ongoing project pipeline
Result
Delivered on schedule with strong coordination and minimal rework.
MTD Drywall’s self-perform capabilities reduced subcontractor overlap and streamlined execution.
This project continues an ongoing relationship with the client, with additional work recently completed
and another project scheduled later this year.






















































